Over-pumping a live sewer has to work first time, in one go, usually overnight. We supply the pumps, pipework and control for bypassing failed, blocked or replaced sections while the flow keeps running.
What you're usually dealing with
The flow doesn't stop. Foul flows follow a daily pattern with morning and evening peaks that can be several times the overnight minimum, and combined systems add whatever the rainfall brings. Sizing on average flow leaves you exposed at peak, and a bypass that can't take peak flow puts sewage on the ground or back into properties.
The contents are the second issue. Rag, wipes and solids will block anything not designed to pass them, and a blocked bypass at two in the morning is the scenario the whole job exists to avoid. Screening or solids-handling capability is part of the specification rather than an optional extra.
Sites are usually constrained. Pipe routes cross roads and footways, which brings traffic management, ramping and pedestrian access into the plan. Working hours are often restricted, so noise governs equipment selection. Confined space entry and hydrogen sulphide exposure apply at the connection points, and odour will attract complaints in residential areas.
The water company will have standards covering how bypasses are set up, attended and monitored on its network, and a spill is reportable to the Environment Agency with the enforcement that can follow.
How we'd approach it
Flow data comes first. If there's a flow survey we'd work from it, and if there isn't we'd want to understand the catchment, the pipe size and gradient, and any storm contribution, then size for peak with margin rather than for average.
Standby capacity isn't optional on a live sewer. We'd specify duty and standby as a minimum, arranged so the standby starts automatically on failure or high level rather than waiting for somebody to notice.
The suction arrangement needs working out on site. Suction lift is limited by atmospheric pressure and in practice by the condition of the suction line, so where the invert is deep, submersible pumps in the wet well usually beat surface-mounted units.
We'd also want to agree who is attending and how alarms reach them. A bypass running unattended overnight needs telemetry that calls out, a documented escalation, and a plan for what happens if the first responder can't clear the fault.
Kit we'd normally look at
- Solids-handling submersible pumps sized on peak flow
- Duty and standby sets with automatic changeover on failure or high level
- Level control and telemetry alarms with dial-out to a nominated responder
- Discharge pipework, road ramps and crossings
- Generators and distribution, with silenced sets where working hours are restricted
Hire or buy
Almost always hire. The requirement lasts as long as the works, and the range of duties across different jobs makes ownership impractical for most contractors.
A job like this
Send us the flow figures and the site constraints and we'll size it with you. If you're already mid-problem, call 01892 832144 in the UK, 1 410 5730 in Ireland, or email sales@euroflo.com.
Sewerage Bypass Pumping applications
- TBC
- TBC
- TBC
Contractors across UK rely on Euroflo for dredging solutions
Whether your project requires temporary construction dewatering we have the knowhow and experience to keep your project flowing safely and efficiently.
Get in Touch


Some of the projects we have worked on...
Pumping