Hochtief needed to move a sealed concrete chamber across a man-made lake and set it down 20 metres below the waterline. Level, and without breaching the site's discharge conditions.

The background

Newhaven Energy Recovery Facility turns 210,000 tonnes of waste a year into around 16.5 megawatts for the national grid, enough to power more than 25,000 homes.

Getting it built was the harder part. The ground had been contaminated by earlier industrial use, so the Environment Agency set tight limits on what could be discharged during construction. Local planning added height restrictions on top, which meant the facility had to sit far lower than a plant of that size normally would.

The problem

The refuse bunker and incinerators needed to go into a reinforced concrete pit 17 metres deep. Conventionally you'd excavate that and pump the groundwater away for months, but the discharge conditions ruled it out.

So Hochtief took a different route. They excavated the pit underwater, inside a cofferdam formed by a reinforced concrete diaphragm wall 53 metres across and 28 metres deep. The caisson itself, a sealed underwater chamber, was built next door in a sheet-piled dry dock. Once the pit was ready, the dock would be flooded and the caisson floated over to its final position.

That left the question of how to keep a structure that size balanced while it was floating, which is where we came in.

What we suggested

We proposed a pumping system built around eight ballast tanks, two on each side of the caisson and forming part of its structure. Controlling the water in each one meant controlling the weight distribution, and keeping the whole thing level.

The other half of it was monitoring. Being able to adjust the ballast is only useful if you can see what's happening, so we wired every pump, control panel and tank level sensor back to a single PC, where levels could be watched and corrected as needed.

How it worked

Sixteen Grindex submersibles went in, positioned both inside and outside each tank so they could fill and empty through a series of 100mm pipework, with some purpose-made assemblies to suit the build.

The first job was keeping the caisson suitably grounded while the dry dock filled around it. Too much movement at that stage causes real problems. Once the 17-metre cofferdam was full, we brought the level back down and floated the structure free, using two Grindex Matadors drawing from the nearby river.

Filling the cofferdam effectively created a man-made lake, and the caisson was floated 53 metres across it into position. Emptying it again took six Matadors in total, three filling and three emptying, discharging back to the river through 8-metre pipework and staying within the environmental limits throughout.

As the water came down, the caisson had to be balanced continuously until it reached its foundation base, 20 metres below the surface. A run of 4" Grindex Majors emptied the structure, with high-performance 110v pumps and puddle sucker attachments clearing the internal chambers down to 3mm. That measurement has to be precise, because the balance depends on it.

The outcome

The caisson settled onto its base as planned. After that, Grindex Major pumps on 450mm pipework, run through control panels with probes and alarms, held the surrounding groundwater at a steady level so backfilling could go ahead with minimal disruption.

Construction carried on until the structure had enough mass to sit stable in the 17-metre pit on its own, supported by the normal groundwater levels around it.

Kit on the job

  • 16 Grindex submersible pumps for the eight-tank ballast system
  • 6 Grindex Matador pumps for filling and emptying the cofferdam
  • 4" Grindex Major pumps for emptying the structure and groundwater management
  • 110v high-performance pumps with puddle sucker attachments, down to 3mm
  • Control panels, probes and alarms, wired to a centralised PC
  • 100mm and 450mm pipework with purpose-made assemblies

Working on something similar? If your project has constraints that rule out the obvious approach, that's usually a good conversation to have early. Email sales@euroflo.com or call 01892 832144.

Get in Touch

Tel: (UK) 01892 832144

Tel: (Eire) 1 410 5730

sale1s@euroflo.com

Our locations

UK Office
Euroflo Fluid Handling Ltd
Wexford place, Lucks Lane
Paddock Wood, Kent
TN12 6PA

Ireland
Unit F1 Baldonnell Business Park
Baldonnell
County Dublin
DUBLIN 22
Ireland

Euroflo are accredited with ISO 9001 as part of our ongoing commitment to quality and excellence in the pumping sector industry

ISO 9001 accreditation

© 2026 | Euroflo Fluid Handling Ltd - registered in England & Wales, reg number: 03205022

Site by Giraffe Design