VBMS had a cable termination point buried under sand and silt, 20 metres down in the outer Thames Estuary. We supplied the dredging pumps to clear it.

The background

VBMS is a Netherlands-based engineering consultancy working in sustainable energy, specialising in grid-to-grid power cable connections for onshore and offshore renewables.

At the London Array, they were connecting supply cables to the base of several turbines and running a wind turbine's mains cable back to a substation on land.

The problem

Sand and sediment had built up over the cable's termination point on the seabed, and none of the connection work could go ahead until it was cleared.

The conditions set the spec fairly narrowly. Whatever went down there had to work at depths of up to 20 metres, survive seawater, shift up to 100 tonnes of sand an hour, and do it without wearing out halfway through the job.

What we suggested

We proposed two Dragflow dredging pumps, a DP50 D on duty with an EL 60HD standing by. Offshore, a breakdown is slow and expensive to recover from, so the standby pump was worth having.

Two choices drove the wear resistance. We specified slow running 6-pole motors at 960rpm, because lower speed means less abrasion in this kind of material, and we went for a high chrome wet end at 28% chrome content to handle what sand does to pump internals.

We also offered to handle the whole package rather than just the pumps, including pipework, power, delivery to the quayside and a technician on hand for the set-up.

How it worked

Both pumps ran on 30 metres of screened safety cable, controlled through an electronic soft-start panel mounted on the barge deck and powered by a Euroflo 250kVA generator.

They moved a mixture of sand, silt and seawater away from the termination point through 50 metres of 200mm pipe, to an open discharge further along the seabed. The mixture ran at a specific gravity of around 1.3 to 1.5, with solids up to 50mm across. Agitators fitted to the pumps mixed the material with seawater before discharge, which kept the clearing operation efficient.

The critical number was velocity. Hold the mixture above 3m/s through the discharge pipe and it keeps moving. Drop below that and it settles in the pipe, 20 metres underwater.

The outcome

The termination point was cleared and the connection went ahead.

Both pumps came out showing no signs of wear, despite spending the job in an abrasive mixture at up to 100 tonnes an hour. That comes back to the motor speed and the chrome content, both chosen with exactly this in mind.

Everything was delivered by truck to the quayside for loading onto the barge, with one of our technicians there to help get it set up.

Kit on the job

  • Dragflow DP50 D dredging pump (duty)
  • Dragflow EL 60HD dredging pump (standby)
  • Slow running 6-pole motors, 960rpm, 28% high chrome wet ends
  • Agitators fitted to both pumps
  • 50m of 200mm diameter discharge pipe
  • Electronic soft-start control panel, barge mounted
  • Euroflo 250kVA generator
  • 30m screened safety cable

Working on something similar? Offshore jobs leave very little room to get the spec wrong, so we'd rather work through it with you properly. Email sales@euroflo.com or call 01892 832144.

Get in Touch

Tel: (UK) 01892 832144

Tel: (Eire) 1 410 5730

sale1s@euroflo.com

Our locations

UK Office
Euroflo Fluid Handling Ltd
Wexford place, Lucks Lane
Paddock Wood, Kent
TN12 6PA

Ireland
Unit F1 Baldonnell Business Park
Baldonnell
County Dublin
DUBLIN 22
Ireland

Euroflo are accredited with ISO 9001 as part of our ongoing commitment to quality and excellence in the pumping sector industry

ISO 9001 accreditation

© 2026 | Euroflo Fluid Handling Ltd - registered in England & Wales, reg number: 03205022

Site by Giraffe Design